COLLIER ROAD OFFICE SUITES

This building looked to expand the thriving Galleria Precinct within the Perth suburb of Morley.  Located on a busy arterial road the project was centred about a grand entrance that

TALBOT AVE

The Client approached Motus with a brief to maximize the capabilities of this inner suburban site in Como.  The project exhibits some architectural flare within the developer driven brief, while

ST PETERS & EMMAUS CHILDCARE

The building is adjacent to the St Peters and Emmaus Church, a joint initiative between the Uniting and Anglican Churches, and was designed as an eighty-place childcare facility. The same

ST PETERS & EMMAUS CHURCH

This building was a joint initiative between the Uniting and Anglican Churches to provide a single place of worship that did not separate the differing faiths, but rather fused them

CANNINGTON – CONCEPT 3

This proposal was a part of the master planning exercise undertaken for the Cecil Ave site in Cannington, further investigating the potential development on site.  Split into five separate buildings

CANNINGTON – CONCEPT 2

This master planning exercise followed local council’s proposal to develop a ‘Town Centre’ along Cecil Avenue in Cannington, linking the local train station with the commercial hub of Albany Hwy. 

CANNINGTON – CONCEPT 1

This master planning exercise followed local council’s proposal to develop a ‘Town Centre’ along Cecil Avenue in Cannington, linking the local train station with the commercial hub of Albany Hwy. 

MUNDARING MIXED USE

Located in the hills community of Mundaring, the project site was an old fire station lot sold off by local council.  The client purchased the land with the intent to

BOURKE ST

Situated near Oxford St in Leederville and sandwiched between high and low density sites, the project required a complex planning strategy to be feasible.  Although outside the planning scheme rules,

MANDURAH TCE

The landmark site, located on the Mandurah Waterfront, provided significant obstacles such as requirements to build above the 50-year flood level, sedimentary soils that complicated the structural capacity of the